期刊文献+

多套载重线证书原理和实施要求 被引量:1

Research on the Principle and Implementation of Multi Sets Load Line Certificate
下载PDF
导出
摘要 为解决大吨位船舶在低等级码头的停靠问题,通过分析船舶载重线和载重吨的相关性,提出增加船舶干舷、降低船舶载重量、签发多套载重线证书的方法,为液货船和25万吨级船舶在低等级港口的停泊提出理论依据。例举某船多套载重线检验案例,为船舶的实际操作作出参考。 In order to solve the problem of the large scale ship berthing on the low-gradeport, according to the correlation analysis of ship load line and dead weight tonnage (DWT),the methods of increasing ship freeboard, reducing the dead weight and issuing multiple setsof load line certificates are proposed, which provide the theoretical basis on berthing for tank-ers and 250,000-tonne ships in low-grade port. An example of multiple sets of load line in-spections of a certain ship is given to provide reference for the actual operation of the ship,which is the reference for operation and survey.
出处 《造船技术》 2018年第1期64-67,共4页
关键词 载重线证书 液货船 大型船舶 港口限制 load line certificate, tanker, large ship port restriction
  • 相关文献

参考文献3

二级参考文献2

  • 11966年国际载重线公约1988年议定书.
  • 2《中国船检》2007年01期.

共引文献1

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部