期刊文献+

海南酒店项目BIM-5D精细化管理研究 被引量:3

Research on BIM-5D Fine Management in Hainan Hotel Project
下载PDF
导出
摘要 本研究以精细化管理理念为指导,结合国内外大型建设项目中BIM技术在设计阶段和施工阶段的应用,从业主视角深入发掘除碰撞检查、综合布局优化、施工漫游及施工模拟等BIM应用点之外,基于BIM-5D技术在投资管控等关键节点的新型并联工作模式,旨在探索企业基于BIM技术进行流程再造以实现精细化建造在成本管理等方面的创新应用,提高工作流程转化的效率,节约交易成本,为企业新建项目BIM技术的应用提供可参考的实施方案。 The research is guided by the concept of fine managementphilosophy. Considering the application of BIM technology in domestic and foreign large-scale construction projects in the design and construction stages,this paper takes the perspective of the owner to explore in depth in addition to collision detection,comprehensive layout optimization,construction and construction simulation for a new parallel operation mode of investment,management and control based on BIM-5D technology in key nodes,additional to existing BIM applications like collision detection,comprehensive layout optimization,construction roaming,construction simulation,etc. This paper also aims at exploring enterprise's progress reengineering based on BIM for innovative applications in areas like fine construction for cost management,to improve workflow transformation efficiency,as well as to save transaction costs,for providing an implementation reference scheme for the BIM application in new project of the enterprise.
出处 《土木建筑工程信息技术》 2017年第2期24-29,共6页 Journal of Information Technology in Civil Engineering and Architecture
基金 国家社科基金项目"政府主导实施BIM情境下公建项目多利益方协同与反腐治理研究"(项目编号:15BGL173) 天津市科技重大专项与工程项目"天津市BIM共享服务信息平台技术研究"(项目编号:15ZXHLSF00040)
关键词 BIM-5D 精细化管理 投资管控 流程再造 BIM-5D Fine Management Investment Management Process Reengineering
  • 相关文献

参考文献4

二级参考文献20

  • 1Wiig K.Knowledge management foundations,Arlington,TX:Schema Press, 1993.
  • 2Jimmy C.Huang,Sue Newell,Knowledge integration processes and dynamics within the context of cross-functional projects,International Journal of Project Management 21(2003),pp.167-176.
  • 3G.K.Kululanga,R.McCaffer, Measuring knowledge management for construction organizations,Engineering,Construction and Architectural Manage ment,2001.8,pp.346-354.
  • 4M.Millic Kwan,P.Balasubramanian,Knowledge Scope:Managing knowledge in context,Decision Support System,35(2003),pp.467-486.
  • 5GB 50168-2006.电气装置安装工程电缆线路施工及验收规范[S],2006.
  • 6余道松.企业电气调整手册[M]武汉测绘科技大学出版社,1997.
  • 7Bazjanac. Applying Information Modeling to Buildings[J]. Virtual Building Environments. 2006 ( 10 ): 185-192.
  • 8蒋灵,何小荣.BP神经网络的置信度分析[J].计算机与应用化学,1999,16(3):213-218. 被引量:7
  • 9肖国荣.BP神经网络在基金价格预测中的应用研究[J].计算机仿真,2011,28(3):373-376. 被引量:17
  • 10张建平,张洋,张新.基于IFC的BIM三维几何建模及模型转换[J].土木建筑工程信息技术,2009,1(1):40-46. 被引量:64

共引文献169

同被引文献21

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部