2N. Hussain Carlos Wong, Matt Carter, Samuel Kwan, Tak-Wah Mak. Hong Kong-Zhuhai- Macao Link[J]. Procedia Engineering, 2011, 14:1485-1492.
3Chris Marshall. The Oresund Tunnel--Making a Success of Design and Build[J]. Tunneling and Underground Space Technology. 1999, 14 (3): 355-365.
4中铁西南科学研究院信息研究室译.厄勒海峡沉管隧道会议论文集[C].2003.
5Niels J Gimsing Claus Iversen, Development and Design of Casting Yard[C].//The Oresund Technical Publications, 2001.
6Fernando Hue Guillermo Serrano, Juan Antonio Bolan. Oresund Bridge - Temperature and Cracking Control of the Deck Slab Concrete at Early Ages [J]. Automation in Construction, 2000, 9 (5-6): 437-445.
7Jan Saveur Walter Grantz. Structural Design of Immersed Tunnels [J]. Tunneling and Underground Space Technology, 1997, 12 (2): 93- 109.
8Hiroshi Kishimoto, Rokkasho: Japanese Site for ITER [J], Fusion Engineering and Design. 2003, 69 (1-4): 553-561.
9M. Medrano C. Alejaldre, J. Doncel. ITER Site Selection Studies in Spain [J]. Fusion Engineering and Design. 2003, 69 (1-4): 537-544.
10Ahmet Gokce Fumio Koyama, Masahiko Tsuchiya. The Challenges Involved in Concrete Works of Marmaray hnmersed Tunnel with Service Life Beyond 100 Years [J]. Tunneling and Underground Space Technology,2009, 24 (5): 592-601.