摘要
高强度预应力混凝土管桩具备施工周期短且穿透力强的特点,且造价较低,可节省施工成本,提高施工企业的经济效益。因此,在施工工作中,企业应制定完善的管理方案,明确各方面管桩施工工作要求,确保在施工中合理使用锤击法施工技术方式,提升施工建设水平,为管桩的后续使用奠定坚实基础。
High strength prestressed concrete pipe pile has the characteristics of short construction period and strong penetration and low cost,which can save the construction cost and improve the economic benefit of the construction enterprise. Therefore,in the construction work,enterprises should make perfect management plan,clarify the requirements of pipe pile construction in all aspects,ensure the reasonable use of hammer method in construction,and improve the level of construction construction. To lay a solid foundation for the subsequent use of pipe piles.
出处
《山西建筑》
2018年第6期79-81,共3页
Shanxi Architecture
关键词
高强度预应力管桩
锤击法
施工技术
high strength prestressed pipe pile
hammering method
construction technology