摘要
介绍了大同某公司因副立井井口选在山区特殊地段,造成井口距离铁路线近、地形高差大、可用空间小且受洪水威胁等局面,对这种情况下如何实现矿井地面总平面布置与高产高效生产进行了分析研究,有利于矿井的安全生产。
Datong, a firm has been introduced for auxiliary vertical well selected special area in the mountains, it causes the wellhead to be closeto the railway line, the height difference of the terrain, the usable space is small and is threatened by the flood, for this kind of circumstance howto realize the mine ground general layout and high yield and high efficiency production are analyzed, beneficial to the safety production of mine.
出处
《山西建筑》
2018年第5期29-31,共3页
Shanxi Architecture
关键词
铁路线
生产能力
平面布置
railway lines
production capacity
plane layout