摘要
新建铁路武广客运专线高岭隧道在运营中出现了渗漏水的问题。详细介绍了长大隧道渗漏水产生的原因、处理方法和施工工艺,推荐采用引排降压和注浆堵水相结合的施工方法,并提出切实可行的技术措施和施工方案。对提高衬砌渗漏水治理水平有着一定的借鉴意义。
The Gaoling Tunnel of the newly-built Wu-Guang Passenger-oriented Railway is troubled with the problem of the leakage of water during its operation. Introduced in detail in the paper are the causes of the leakage of water in long and big tunnels,the treating methods and construction processes for it. It is highly advisable that the methods of depressurizing by drainage and blocking water by slip-casting be used for long and big tunnels. Besides,some feasible technical measures and con-struction schemes are also put forward in the paper. The paper may well serve as a useful reference for improving the anti-leak- age performance of the lining and the treatment of the leakage of water in tunnels.
出处
《国防交通工程与技术》
2018年第2期62-66,共5页
Traffic Engineering and Technology for National Defence
关键词
长大隧道
引排降压
注浆堵水
long and big tunnels
depressurizing by drainage
block water by slip-casting