9Ayhan Demirbas, Haydar Yuksek, Ismail Cakmak.Recovery of boric acid from boronic wastes by leaching with water, carbon dioxide- or sulfur dioxide-satrated water and leaching kinetics[J].Resources, Conservation and Recycling ,2000,28:135-146.
10Recep Boncukcuoglu, M Tolga Yilmaz, M Muhtar Kocakerim.Utilization of borogypsum as set retarder in Portland cement production[J].Cement and Concrete Research,2002,32:471-475.