期刊文献+

变截面预应力混凝土箱梁桥结构计算与病害分析

Structural calculation and disease analysis of the section changeable PC continuous box-girder bridge
下载PDF
导出
摘要 为了验证变截面预应力混凝土箱梁桥的病害产生原因,实地随机调查交通量并确定三种典型荷载工况,用有限元软件建立了梁桥模型并进行了结构计算分析。研究结果表明:超载是该桥产生箱梁底板横向开裂的主要原因,竖向预应力失效导致腹板内侧开裂严重,纵向预应力钢束定位偏差易导致底板混凝土分层劈裂。 In order to verify the cause of disease of the section changeable PC continuous box-girder bridge,a field survey was carried out randomly to determine the traffic volume. Then confirmed three typical load conditions. Finally,a bridge mode was established with the finite elements software and applied the structure analysis and calculation. The results show that the overloading is the main reason for the transverse cracking of the bottom plate of the bridge,the failure of vertical pre-stress cause the inside of the abdominal plate to crack badly,and the positioning deviation of longitudinal pre-stressed steel beam is easy to split the bottom slab concrete.
作者 魏道凯
出处 《黑龙江交通科技》 2018年第1期87-89,共3页 Communications Science and Technology Heilongjiang
关键词 超载 结构计算 病害分析 overloading structural calculation disease analysis
  • 相关文献

参考文献1

二级参考文献3

  • 1堪润水;胡钊芳.公路桥梁荷载试验[M]{H}北京:人民交通出版社,2003.
  • 2胡大琳.桥涵工程试验检测技术[M]{H}北京:人民交通出版社,2000.
  • 3宋一凡.公路桥梁荷载试验与结构评定[M]{H}北京:人民交通出版社,2002.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部