摘要
向矿区提供生产、生活所需电力的高压架空线路是矿区安全、稳定生产的重要保障,本文简要介绍了煤矿高压架空供电线路受采矿塌陷影响后造成的杆塔倾斜、变形;导线弧垂严重变化等影响线路安全运行情况的就地治理及防范措施,对今后煤矿企业架空供电线路受塌陷影响的维护、治理具有一定借鉴意义。
The high-voltage overhead line to provide the power for production and living of mine area is the important guarantee of mine safety and the stable production of the coal mine, this paper briefly introduces the high voltage overhead power lines affected by mining subsidence caused by the influences of tower inclination deformation; local governance, serious changes of conductor sag line operation and preventive measures, to maintenance and of governance the overhead power lines affected by collapse has certain reference significance in future.
出处
《煤矿现代化》
2018年第3期131-132,共2页
Coal Mine Modernization
关键词
矿区塌陷
高压架空线路
就地治理
subsidence of mine area
high pressure overhead line
in-situ treatment