装配式带状景观顶盖成套施工技术研究 被引量:1

Study on Packaged Construction Technology for Fabricated Ribbon Landscape Roof
下载PDF
导出
摘要 上海某滨江工程项目需在新建路面上方加设顶盖以用于建设滨江景观带,但受道路净空、顶盖结构厚度及控制性规划限制的影响,无法满足种植覆土厚度的要求,且景观方案滞后,在结构先行施工的情况下,无法进行预留。经研究,决定采用反梁结构来满足覆土需要,并采用装配式工艺用于解决景观方案滞后问题,在实际建设过程中取得了较好的成果,可供类似工程参考。 A Shanghai Binjiang engineering project needs to add a top cover over the newly built pavement for the construction of the Riverside Landscape Belt. However, due to the influence of the road clearance, the thickness of the roof structure and the restriction of controlled planning, the thickness of planting cover soil can be not satisfied. Furthermore, the landscape plan lags behind, in the case of beforehand structural construction, the top cover also can be not reserved. According to proper study, it was decided to adopt the anti-beam structure to meet the need of cover soil, and the assembly process was used to solve the problem of lag behind landscape plan. The actual construction has achieved good results and can provide references for similar projects.
出处 《建筑施工》 2018年第2期198-200,共3页 Building Construction
关键词 装配式 景观顶盖 种植屋面 反梁结构 prefabricated landscape top cover planted roof anti-beam structure
  • 相关文献

参考文献6

二级参考文献15

  • 1蔡鸿飞.无粘结预应力混凝土大梁的施工实例[J].建筑技术开发,2004,31(9):43-43. 被引量:8
  • 2李明顺,徐有邻,白生翔,等.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002.
  • 3预应力筋用锚具、夹具和连接器应用技术规程.JGJ85-2000.[S].
  • 4建筑工程预应力施工规程.CECS180:2005.[S].
  • 5潘红,储劲松.屋顶绿化的技术关键[J].四川建筑,2007,27(4):21-22. 被引量:5
  • 6.混凝土结构设计规范GB50010-2002[S].北京:中国建筑工业出版社,2002..
  • 7国家人民防空办公室.GB 50038-2005 人民防空地下室设计规范[S].北京:中国建筑标准设计研究院,2005
  • 8B. Y. Ye, X. C. Liu, J. P. Liu, et al. New method of Pre-stress Grinding for Gearlike Cylindrical Surface [ J ]. Key Engineering Materials, 2006 ( 26 ) : 304-305,593.
  • 9周小芳.屋顶花园施工技术探讨[C].2010北京园林绿化新起点[A].2010.
  • 10张一峰,何俊泽.关于屋面建筑节能设计措施的分析[J].山西建筑,2008,34(23):242-243. 被引量:6

共引文献2

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部