期刊文献+

钱家营矿-850主石门区域防突工程地测保障措施分析 被引量:1

Geological Survey Safeguard Measure Analysis on Main Cross-hole Outburst Prevention Project in Qianjiaying Coal Mine
下载PDF
导出
摘要 开滦集团钱家营矿-850主石门施工至774 m位置时,围岩来压明显。在超前探查5煤层赋存状况过程中,钻孔喷孔,瓦斯异常。为做好"防突"工作,钱家营矿在-850主石门区域优先开展了地测技术保障工作,具体有涵盖防突工程全周期的精密控制测量、疏水降压措施、地质及瓦斯地质详查等,构建了适合钱家营矿区域特点的防突技术支撑体系。 The surrounding rock pressure is obvious when the-850 main cross-hole in Qianjiaying Mine of Kailuan Group constructs to 774 m position. In the process of advanced exploration of the occurrence conditions in 5 coal seam, the holes are spray-ing and the gas is abnormal. In order to do a good job of"outburst prevention", Qianjiaying Mine has carried out geotechnical safeguards work of-850 main cross-hole, including precision control measurement, dewatering and depressurization measures, geological and gas geology detailed investigation and so on, which constructs an outburst prevention technical support system suitable for the regional characteristics of Qianjiaying Mine.
作者 李风志
出处 《煤矿安全》 CAS 北大核心 2018年第2期118-120,共3页 Safety in Coal Mines
关键词 地测保障 防突措施 首级控制 地质构造 疏水降压 geological survey support outburst prevention measure primary control geological structure dewatering and depres-surization
  • 相关文献

参考文献10

二级参考文献9

共引文献30

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部