双向调压塔和空气罐在停泵水锤防护措施中的应用 被引量:6

Application of Bidirectional Pressure Regulating Tower and Air Tank in Protection Measures for Water Hammer by Pump Stop
下载PDF
导出
摘要 结合某配套供水工程质量要求,对该压力输水系统进行水力过渡过程仿真计算,模拟工程设计和运行中可能出现的水力过渡过程,分别采用"双向调压塔+进排气阀"联合水锤防护方案及"空气罐+进排气阀"联合防护2套方案,对扬水泵站抽水断电过渡过程进行计算比选,最终得到"空气罐+进排气阀"联合防护方案可以消除停泵水锤,所需空气罐容积仅为9.42 m3,具有较好的工程经济性。 In combination with quality requirements on water supply works, the hydraulic transition process of the pressed water transmission system is computed, The hydraulic transition processes possibly occurring in design and operation are simulated. Two combined schemes for protection, bidirectional pressure regulating tower with intake/exhaust valves and air tank with intake/exhaust valves, are applied respectively to calculate, compare and select the protection for the transition process during power off in the pump station. Tne scheme of air tank with intake/exhaust valves is selected as it can eliminate the water hammer by pump stop. Furthermore the air tank required is with low cost as its volume is 9.42 m3 only.
作者 吴亮
出处 《西北水电》 2018年第1期92-94,共3页 Northwest Hydropower
关键词 水力过渡 停泵水锤 双向调压塔 水锤压力 空气罐 仿真分析 hydraulic transition water hammer by pump stop bidirectional pressure regulating tower water hammer pressure air tank simulating analysis
  • 相关文献

参考文献1

共引文献8

同被引文献47

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部