摘要
新夏港船闸为改造扩建船闸,平面的"错位式"双线布置从平面布置减小了工程所需的空间,钢板桩的结构方案从施工方面降低了基坑开挖对周边环境的影响。通过平面和结构两方面的调整,有效的解决了船闸工程区域东西两侧的制约问题。
To renovate and expand the ship lock in Xinxia port, the plane staggered double-line layout and the construction of steel sheet pile structure are adopted to reduce the space required for the project and lower the influence of foundation pit excavation on local environment respectively. The plane and structural adjustment can solve effectively the restriction on the east and west sides of the ship lock project site.
出处
《港工技术》
2018年第1期19-21,共3页
Port Engineering Technology
关键词
双线船闸
改建和扩建
“错位式”布置
钢板桩
港口
港口工程
航道
double-line ship lock
reconstruction and expansion
staggered layout
steel sheet pile
harbor
port engineering