摘要
近年来,我国路桥工程建设事业有了很大发展,不仅数量越来越多,而且更倾向于建设一些大规模、大跨度的道路和桥梁。论文具体介绍了该技术在路桥施工中的应用,并针对应用过程中常见的问题提出了一些解决对策,希望能促进预应力技术在路桥工程中更好地发挥其作用。
In recent years, the construction of road and bridge engineering in China has made great progress, not only the number is more and more, but also tend to build some large-scale, large-span roads and bridges. This paper introduces the application of the technology in the construction of road and bridge, and puts forward some countermeasures for the common problems in the application process, hoping to promote the prestressing technology to better play its role in the road and bridge engineering.
出处
《工程建设与设计》
2018年第4期161-162,共2页
Construction & Design for Engineering
关键词
路桥施工
预应力
应用
问题
对策
road and bridge construction
prestress
application
problem
countermeasure