铁路建设所需的混凝土量较大,根据铁建设[2005]160号文的要求,应针对建设工程规模和对混凝土的需求量,布设混凝土拌和站集中拌合混凝土进行施工。这样不仅能有效控制混凝土工程造价,还能保证施工质量。此文以常规混凝土拌和站的机械配备和主要技术参数为参照,在分析混凝土拌和站所具备的生产能力的基础上,对混凝土拌和站的布设方案进行探讨。
The amount of concrete required for railway construction is large. According to the requirements of Document No. [2005] 160 of railway construction, the layout of concrete mixing station should be carried out according to the scale of construction project and the demand for concrete. This can not only effectively control the concrete cost, but also guarantee the construction quality. According to the mechanical equipment and main technical parameters of the conventional concrete mixing plant, the layout Plan of concrete mixing station is discussed based on the analysis of production capacity of concrete mixing station
出处
《铁路工程技术与经济》
2018年第2期28-31,共4页
Railway Engineering Technology and Economy
关键词
铁路建设
混凝土工程
拌和站布设
方案
Railway construction
Concrete engineering
Mixing station layout
Plan