小净空上跨营业线连续梁中跨合龙吊架施工关键技术 被引量:6

Key Construction Technology of Mid-span Closing Hanger with Small Clearance for Continuous Girder over Business Line
下载PDF
导出
摘要 新建武汉—十堰高速铁路云安特大桥转体连续梁上跨营业线汉丹铁路,梁底距离铁路净空仅2.2m。基于传统跨营业线合龙的方法,提出了一种新型可行走吊架法,并利用有限元建模分析了其可行性,在实际施工过程中成功解决了跨营业线小净空合龙施工技术难题。 The swivel continuous girder of Yun'an Bridge,which is a part of the new-built high-speed railway from Wuhan to Shiyan,and is designed over Wuhan-Danjiangkou business line. The clearance distance between the line and girder bottom is only 2. 2 m. This paper proposes a new method named walkable hanger based on the traditional method of closure constructions over business line,and its feasibility is analyzed by finite element modeling. Small clearance construction technology problems over business line are successfully solved.
出处 《施工技术》 CAS 2018年第5期55-57,82,共4页 Construction Technology
基金 中建三局集团有限公司科研项目(CSCEC3B-2016-11)
关键词 桥梁工程 高速铁路 小净空 数值模拟 试验 合龙 吊架 施工技术 bridges high-speed railway small clearance simulation testing closure hanger construction
  • 相关文献

参考文献4

二级参考文献19

  • 1吴海军,刘健,张雷,王桢.摩阻效应对现浇平转连续梁桥转体前变形的影响[J].重庆交通大学学报(自然科学版),2012,31(z1):665-667. 被引量:7
  • 2吴必刚.预应力混凝土连续刚构桥的合龙工艺[J].铁道建筑,2007,47(1):12-13. 被引量:3
  • 3中交第二公路工程局有限公司.刘房子哈大铁路立交特大桥跨既有京哈铁路转体施工方案[R].西安:中交第二公路工程局有限公司,2009.
  • 4中华人民共和国住房和城乡建设部.JGJ162-2008建筑施工模板安全技术规范[s].北京:中国建筑工业出版社,2008.
  • 5中华人民共和国铁道部.TB10415--2003铁路桥涵工程施工质量验收标准[S].北京:中国铁道出版社,2004.
  • 6中华人民共和国铁道部.TB10303--2009铁路桥涵工程施工安全技术规程[s].北京:中国铁道出版社,2009.
  • 7中华人民共和国铁道部.TB10002.1-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2005.
  • 8中华人民共和国铁道部.TB10002.2-2005铁路桥梁钢结构设计规范[S].北京:中国铁道出版社,2005.
  • 9向富中,桥涵施工控制技术[M].北京:人民交通出版社,2001.
  • 10董琴亮,毕来发,荀东亮,等.新建哈大客运专线跨铁路桥水平转体法设计与施工监控[C]//第十九届全国桥梁学术会议论文集(上册).2010.

共引文献46

同被引文献27

引证文献6

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部