基于WBS-RBS及AHP-FCE模型的生产项目风险分析 被引量:1

Risk Analysis For Production Projects Based on Wbs-Rbs and AhpFce Model
下载PDF
导出
摘要 传统的生产项目在进行项目管理中,风险管理水平往往取决于项目经理的经验备,进而在生产项目中存在较大的主观性,缺少科学合理的风险评价方法。文章基于WBS-RBS、层次分析法和模糊综合评价法,对S公司的生产项目进行客观的风险评价,保证了风险评价过程的规范化。 In the project management process of traditional production project,risk management level often depends on the project manager's experience,resulted in the larger subjectivity in production projects and being lack of scientific and reasonable risk assessment methods. Based on WBS-RBS, analytic hierarchy process and fuzzy comprehensive evaluation, this paper carded out objective risk assessment of S company's production projects,and guaranteed the standardization of risk evaluation process.
作者 邹新璐 ZOU Xin-lu1,2(1.Antai College of Economics & Management, Shanghai Jiaotong University, Shanghai 200052 China; 2.School of Electronic Information and Electronic Engineering, Shanghai Jiaotong University, Shanghai 200052, Chin)
出处 《企业技术开发》 2018年第2期104-105,111,共3页 Technological Development of Enterprise
关键词 WBS—RBS 层次分析法 模糊综合评价法 WBS-RBS Analytical Hierarchy Process Fuzzy Comprehensive Evaluation
  • 相关文献

参考文献1

二级参考文献9

共引文献7

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部