3Claridge D,Liu M,Haberl J. Can you achieve 150% of predicted retrofit savings Is it time for recommissioning. Proeeedings of 1996 ACEEE Summer Study on Energy Efficiency in Buildings, 1996,59-67.
4Claridge D,Culp C. Campus2wide continuous commissioning of university buildings.Proceedings of ACEEE Summer Study on Energy Efficiency in Buildings, Pacific Grove, CA, 2000, 101 - 112.
5廖常初.S7-200PLC应用技术[M].北京:机械工业出版社,2003.
6Onur KARASAKAL. Implementation of a New Self-Tuning Fuzzy PID Controller on PLC [ J] , Turk J Elec Engin. 2005,13 (2).
7H. X. Li, S. K. Tso. A fuzzy PLC with gain-scheduling control resolution for a thermal process-a case study[ J]. Control Engineering Practice. 1999:523 - 529.