期刊文献+

三峡水库汛末蓄水对鄱阳湖水位的影响研究 被引量:6

The Impact of Three Gorges Reservoir Impoundment on Water Levels in Poyang Lake
下载PDF
导出
摘要 三峡水库汛末蓄水改变了长江中下游的水文过程,对鄱阳湖水位存在潜在影响。采用多元线性回归模型建立鄱阳湖水位与汉口流量、5河(赣江、抚河、信江、饶河、修水)流量的函数关系,并假设该函数关系在三峡水库运行前后保持不变。通过三峡水库运行后引起的汉口流量改变值,得到鄱阳湖水位的变化量。拟定3种不同的蓄水方案,分析了鄱阳湖水位受三峡水库蓄水的影响大小及空间格局特征。结果表明:受蓄水影响,起蓄时间10月1日、9月15日和9月1日对应的星子站水位降低值分别为2.23、1.37和1.05 m,都昌站分别为2.10、1.29和0.99 m,康山站分别为1.38、0.91和0.68 m。水位影响随起蓄时间的提前而减弱,空间上呈北高南低的格局。从消除或减免三峡水库蓄水对鄱阳湖的影响角度,建议优化三峡水库汛末蓄水调度方式,并做好与鄱阳湖5河支流水库调度之间的协调。 The refill operation of Three Gorges Reservoir (TGR) at the end of flood season potentially alters the water level regimes in Poyang Lake by reducing Yangtze River flow discharge. The multiple linear regression model is established to estimate the water level of Poyang Lake with catchment inflow (Five Rivers, i.e. Ganjiang, Fuhe, Xinjiang, Raohe, Xiushui) and Yangtze River (Hankou) flow as explanatory variables. The functional relationship is assumed to remain unchanged before and after the operation of TGR. The water level changes of Poyang Lake then are obtained by Hankou flow changes due to refill operation of TGR. Three impoundment schemes are drawn up to analyze the impact of TGR refill operation on water levels in Poyang Lake and its spatial pattern. Results show that the water level reductions induced by TGR refill operation for Xingzi, Duehang and Kangshan Station are 2.23 m, 1.37 m and 1.05 m, 2.10 m, 1.29 m and 0.99 m, 1.38 m, 0.91 m and 0.68 m associated with impoundment start time of October 1, September 15 and September 1. It is suggested that the TGR refill operation scheme be optimized at the end of the flood season, and the coordination of reservoirs" operation in the catchment is achieved to eliminate or weaken the impact of TGR refill operation of Poyang Lake.
作者 刘章君 成静清 温天福 牛娇 赵楠芳 LIU Zhang-jun1,2,3, CHENG Jing-qing1 , WEN Tian-fu1 , NIU Jiao1 , ZHAO Nan-fang1(1. Jiangxi Provincial Institute of Water Sciences, Nanchang 330029, China; 2. Research Center of Water Resources and Ecological Environment of Poyang Lake, Ministry of Water Resources P.R.C, Nanchang 330029, China; 3. Jiangxi Provincial Key Laboratory of Water Resources and Environment of Poyang Lake, Nanchang 330029, Chin)
出处 《中国农村水利水电》 北大核心 2018年第2期103-108,112,共7页 China Rural Water and Hydropower
基金 江西省自然科学基金项目(20142BAB21702 2015ZBBF60006) 江西省水利科技计划项目(KT201508 KT201601)
关键词 鄱阳湖水位 三峡水库 汛末蓄水 多元线性回归模型 Poyang Lake water level Three Gorges Reservoir refill operation multiple linear regression model
  • 相关文献

参考文献10

二级参考文献85

共引文献192

同被引文献71

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部