摘要
在工程设计中,既有站计算机联锁设备改造采取新设或利旧的方式,但两者之间到底如何选择没有绝对的量化标准,设计方案不合理将导致工程实施困难甚至无法实施。因此,有必要通过工程实例总结出对改造站联锁设备新设还是利旧的研究方法,为今后类似工程设计提供参考和借鉴。
In the design of reconstruction of computer-based interlocking equipment for the existing station, two modes can be adopted, one is to set new equipment, and the other is to use existing interlocking equipment. There is no criterion for adopting which mode, but an unreasonable design would result in unpredictable difficulty during the engineering construction, so it is necessary to study this issue based on a project case for providing reference for implementing similar projects in the future.
作者
池春玲
CHI Chunling(China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan 43006)
出处
《铁路通信信号工程技术》
2018年第3期4-10,共7页
Railway Signalling & Communication Engineering
关键词
改造
计算机联锁
新设
利旧
reconstruction
computer-based interlocking
adding new equipment
application of existing equipment