生料库预制减压锥施工工艺的研究与应用

Research and Application of Precast Decompression Cone Construction Technology in Raw Meal Silo
下载PDF
导出
摘要 国内外传统混凝土筒仓减压锥通常为整体浇筑设计,现场通过搭设高大模支承体系现浇混凝土施工。为节省搭设脚手架及其他方面的成本,本工程两个生料库减压锥采用现场支模整体现浇施工与现场分片预制施工及吊装两种施工方法。对于预制施工,通过总结以往减压锥的施工经验,突破预制减压锥施工技术难点,从合理布置场地、绑扎浇筑、养护、选用机械、吊装就位等方面制定施工方案。结合预制锥体受力特性、现场吊装特点及浇筑特点,完成该施工工艺的技术突破及创新过程。最后通过对比两种减压锥施工方法,得出结论。 Overall design, building formwork and east-in-situ construction on site are adopted usually for traditional contrete silo decompression cone at honle and abroad. In order to research saving the cosl of fprmwork and other, two construction ways are adopted for deompression cone of the two raw meal silos of this project: tast-in-situ construction on site: precast concrete on site and lifting and installation. For precast construction, through summarizing the construction experience of previous decompression cone, breaking through the technital diffieuhies of decompression cone construction, we make construetion plan from the follow sides: reasonable arrangement of the site, rebar tying, casting, maintenance, selection of machinery, hosting, etc. In combination with the characteristics of pretast element, hosting anti casting, the technical breakthrough and innovation process construtqion process are completed. At last, through two construction ways, we get the conclusion.
作者 张思才 荣亚坤 周杏军 仵亚飞 向春林 陈平 易新克 ZHANG. Sicai. RONG. Yakun, ZHOU Xingjun,WU Yafei ,XIANG. Chtmlin.(:HEN Ping. YI Xinke (CBMI Construction Co., Ltd., Beijing 100176)
出处 《水泥技术》 2018年第2期82-86,共5页 Cement Technology
关键词 减压锥施工 预制锥体 吊装 施工成本 decompression cone construction: prefabricated cone, lifting and installalion cost of construction
  • 相关文献

参考文献2

二级参考文献2

  • 1中华人民共和国国家标准.GB50077-2003钢筋混凝土筒仓设计规范[S].北京:中国计划出版社,2004.
  • 2李常平.筒仓减压锥三维应力分析[EB/OL].http://wenku.baidu.com/view/846925e819e8b8f67clcb9f6.

共引文献118

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部