盾构法施工海底隧道孤石及基岩侵入体爆破施工风险分析 被引量:3

Risk Analysis on Blasting of Boulder and Bedrock Intrusion in Sea-crossing Tunnel Bored by Shield Machine
下载PDF
导出
摘要 针对复合地层中,开挖断面内局部高强度基岩及孤石侵入体,盾构自身刀具无法有效破岩施工难点,在综合分析地面引孔下药施爆的控制钻爆法,控制破碎碴块体量基础上,对爆破产生的影响因素进行系统归类,建立孤石及基岩侵入体爆破施工风险综合评价指标体系,并结合层次分析法和模糊集法分别确定各级因素权重及隶属函数,评估其风险接受等级。实践证明:在设计和施工上采取合理的措施后,基岩及海域孤石地层预爆破风险评估切实可行的,风险规避措施有效。 The rock breaking efficiency of cutter tools of shield machine is low in complex stratum with local high intension bedrocks and boulders.The controlled drilling and blasting method and controlled broken rocks are synthetically analyzed.The influences induced by blasting are systematically classed.The evaluation system of blasting risks of boulder and bedrock intrusion is established.The factor weight and membership function of each risk grade are determined by means of APH method and fuzzy method,so as to estimate the risk acceptable grade.The practice shows that the mentioned methods are reliable and effective.
出处 《隧道建设》 2012年第S2期31-36,共6页 Tunnel Construction
关键词 海底隧道 孤石 基岩侵入体 控制爆破 模糊层次分析 风险分析 sea-crossing tunnel boulder bedrock intrusion controlled blasting fuzzy analytic hierarchy process risk analysis
  • 相关文献

参考文献7

二级参考文献41

共引文献319

同被引文献21

引证文献3

二级引证文献316

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部