摘要
重庆市轨道交通六号线一期江北城车站为跨暗挖车站,在施工过程中车站大跨暗挖隧道段发生局部坍塌,虽然没有人员伤亡,但坍方规模大,经济损失达9 190 337元。文章首先介绍了车站的施工方法工艺,对事故原因从直接原因和间接原因方面进行了分析和探究,并提出了防止类似事故发生的技术措施,供类似工程参考借鉴。
Jiangbeicheng station is a mined large span station on No.6 line of Chongqing rail transit system.There is 9 190 337 Yuan economic losses caused by the big collapse happened during the construction of this station,though no casualty is leaded.In this paper,the construction method for Jiangbeicheng station is introduced first.And then the direct and indirect causes of the collapse are analyzed and the prevention measures are proposed for the similar construction condition.
出处
《隧道建设》
2012年第S2期123-127,共5页
Tunnel Construction
关键词
轨道交通
大跨暗挖车站
坍塌
rail transit system
mined large span station
collapse