期刊文献+

美国奥洛维尔水库的工程安全管理问题简析 被引量:4

Study on the regulatory reason of spillway erosion accident of Oroville Dam
下载PDF
导出
摘要 2017年2月,美国加利福尼亚州奥洛维尔水库出现了严重的溢洪道冲刷破坏事故,引起国际水利水电工程界强烈关注。本文分别介绍了美国地方政府所属大坝的安全管理基本情况和加利福尼亚州所辖大坝安全管理情况,探讨了奥洛维尔工程安全管理存在的问题,分析了工程应急响应的组织模式。从工程安全管理上看,奥洛维尔水库事故出现事故的原因,核心在于安全管理权责不匹配、责任缺位与越权管理并存;监督检查流于形式、运行维护费用投入不足、风险评估不科学等,也是导致事故出现的管理方面原因。 A serious spillway erosion accident occurred in Oroville reservoir in California State of the Unit-ed States in February 2017,which received significant attentions from international hydraulic engineers. Ba-sic situation of dam safety management in the United States is introduced in this paper. Meanwhile,safetymanagement situation of dams under jurisdiction of California State is investigated. Problems on safety man-agement of Oroville project are explored. Emergency response in Oroville accident is also analyzed. Accord-ing to the authors' opinion,the main managerial reason of the accident is the mismatching of administra-tive responsibility and management right. The government of California State did not well perform its man-agement duty. However,the Federal Energy Regulatory Committee of the United States acted beyond its au-thority by mistake. Besides,there were three other managerial reasons that might responsible for the acci-dent. Firstly,the periodic inspection became a mere formality. Existing damage and defection of spillwaywas not discovered for a long time. Secondly, maintenance and repair budget for the dam was limited.Thirdly,risk assessment in emergency action was unscientific.
作者 曹逵 邓刚 铁梦雅 张茵琪 温彦锋 殷旗 CAO Kui, DENG Gang, TIE Mengya, ZHANG Yinqi, WEN Yanfeng, YIN Qi(State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, Chin)
出处 《中国水利水电科学研究院学报》 北大核心 2018年第1期29-36,共8页 Journal of China Institute of Water Resources and Hydropower Research
基金 国家重点研发计划(2017YFC0404803) 中国水科院基本科研业务费专项(GE0145C062017 GE0145B562017)
关键词 水库大坝 事故 安全管理 责任主体 监管 dam accident safety management subject of responsibility supervision
  • 相关文献

参考文献1

二级参考文献4

  • 1郭军.美国大坝的安全与防卫[J].中国水利,2006(16):54-55. 被引量:2
  • 2[1]A Progress Report on the National Dam Safety Program,Fiscal Years 2004 and 2005[J].FEMA,576/September,2006.
  • 3[2]The National Dam Safety Act of 2006(P.L.109-460)[EB/OL].http://www.damsafety.org.
  • 4[3]Robin Charlwood,David Bowles,Bruce Muller,et al.Recent Trends in Dam Safety Management in the USA,Symposium on Dam Safety Management[A].Role of State,Private Companies and Public in easigning,Constructing and Operating of Large Dams[C].ICOLD 75th Annual Meeting,Saint Petersburg,Russia,2007.

共引文献11

同被引文献19

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部