根据《建设项目环境保护设施竣工验收监测技术要求(试行)》,分别从前期资料收集、现场勘查、确定验收监测方案和编制验收监测报告等方面,分析了建设项目竣工环境保护验收监测应重点关注的问题。
Following the instructions of the "Technical Requirements for Environmental Check and Acceptance Monitoring of Completed Construction Project (on trial)", this paper identifies and analyzes issues needed to be focused on in different stages of an entire monitoring process, including preliminary data collection, site investi- gation, monitoring plan makine, and results reDortine.
出处
《环境保护与循环经济》
2018年第1期66-68,共3页
environmental protection and circular economy
关键词
建设项目
竣工验收监测
方案
报告
construction project
check and acceptance monitoring
plan
report