为了解决玉溪矿巷道底鼓现象,通过深入研究与分析比较,提出了软岩巷道底鼓综合治理技术,即:采用"预应力全长注浆锚索锚固+钢筋笼+‘几’字型钢筋梯子梁+混凝土浇筑"的联合底鼓治理技术。通过现场工程实践表明,该底鼓修复技术在软岩巷道底鼓治理方面起到了很好的效果。
In order to control the roadway floor heaving in Yuxi Coal Mine,the comprehensive control technology for soft rock roadway floor heaving is proposed through deep research,analysis and comparison,using a combined floor heaving control technology comprising pre-stressed full length grouting anchor cable,rebar cage,rebar ladder girder and concrete pouring. According to the results of field engineering practice,favorable floor heaving control effect has been achieved using the proposed technology.
作者
张建林
ZHANG Jian-lin(Yuxi Coal Mine of Shanxi Lanhua Sci-teeh Venture Co., Ltd., Jineheng 048200, Chin)
出处
《煤炭工程》
北大核心
2018年第3期50-52,共3页
Coal Engineering
关键词
软岩巷道
底鼓治理
全长注浆锚索
钢筋笼
“几”字型钢筋梯子梁
soft rock roadway
floor heaving control
full-length grouting anchor cable
reinforced rebar cage
rebar ladder beam