上海青浦朱家角轨道交通停车场工程具有施工内容复杂、土方施工工程量大、预制屋架运输困难、检修线施工精度要求高等难点。在施工过程中,通过采取施工流程优化、土体改良和平衡、屋架现场预制、检查坑及轨道架设一体化施工等措施,成功完成了施工任务,并保证了施工工期和施工质量,可为其他类似工程提供借鉴。
Shanghai Qingpu Zhujiajiao rail transit parking lot project has various difficulties, including complex construction content, large quantity of earthwork construction, difficult transportation of prefabricated roof truss, high requirements of construction precision for maintenance line, and so on. During the construction process, the construction tasks have been successfully completed by taking corresponding technical measures, such as construction process optimization, soil improvement and balance, prefabrication of roof truss on site, integrated construction of inspection pit and track erection and etc., which can ensure the construction period and quality and can provide references for similar projects.
作者
施智亮
SHI Zhiliang(Shanghai Construction No.5 (Group) Co., Ltd., Shanghai 200063, China)
出处
《建筑施工》
2018年第3期361-363,共3页
Building Construction
关键词
轨道交通停车场
施工流程优化
预制屋架
精度控制
关键施工技术
rail transit parking lot
construction process optimization
prefabricated roof truss
precision control
key construction technology