摘要
2011年11月,江汉钻井进入玻利维亚之后的第一口井SRS-10井完钻。在玻利维亚的这段时间,通过与外籍人员不断磨合中增强业务水平,提高了工作质量,在强大的责任心下,抓好现场管理,搞顺组织生产,加强员工培训,保证生产安全,做好设备维护。
In November 2011, the first well SRS-10 well after Jianghan drilling into Bolivia was drilled.During this period of time in Bolivia, we constantly improve ourselves with our foreigners to improve our work quality and work under the strong sense of responsibility.We should do a good job in site management, organize production, strengthen staff training, ensure production safety and make equipment maintain.
出处
《化工设计通讯》
CAS
2018年第2期161-161,共1页
Chemical Engineering Design Communications