摘要 某高边坡排土场采用排土机排土工艺,在确定台阶允许的最大高度后,为了确定由现状单台阶高边坡排土场调整为多台阶排土场后下部台阶的排土工艺,通过分析各种技术上可行的排土工艺及其适用性,重点分析、比较了溜槽溜放—汽车倒排与自卸汽车直排2种排土工艺,得出溜槽溜放—汽车倒排工艺明显降低投资,节省运营费用,对类似高边坡排土场边坡优化、治理具有较强的适用性和参考借鉴价值。 The dumping plough is used in the dump with high slope, after the determination of the maximum height allowed by steps, in order to select the optimal dumping technique of the lower steps of the dump with multiple steps transported by the one with high slope and single step, the feasible dumping techniques and their adaptive are analyzed, the dumping techniques of chute humping-automobile trans- portation and dumper transportation are analyzed emphatically,the results show that the economic indica- tors of investment and transportation cost of the former are superior to the later, which can provide some technical reference for the slope optimization and governance of the dumps with high slope.
作者 李小艾 屈晓朋 Li Xiaohi Qu Xiaoming(Shenkan Qinhuangdao General Engineering Design & Research Institute Corporation, MC)
出处 《现代矿业》 CAS 2018年第2期163-166,共4页 Modern Mining
关键词 排土场 高边坡 溜槽 胶带运输 汽车倒排 Dump, High slope, Chute, Belt conveyor,Automobile transportation
  • 相关文献

参考文献2

共引文献2

同被引文献30

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部