摘要
结合龙潭水库枢纽工程现状,对三种供水方案分析比较,根据施工难易性和后期运行管理的便利性等因素综合比较,得出东、西岸各建一个泵站的供水方案最优;对浮船式泵站取水和岸边竖井式泵站两种取水方案进行比选,选定竖井式泵站为本工程取水方案。为项目实施和建后管理提供切实可行的技术保证。
According to the current situation of Longtan reservoir project, after comparison and analysis of three water supply schemes,the article is based oncomprehensive comparison of construction difficulty and convenience of post-operation management, it is concluded that the water supply scheme is of pump station each built in the east and west banks at best. Comparison the pumping station pumping station to the shore shaft pumping station and selection of shaft pumping station is for the project-based water intake program. The above mentioned provide practical technical assurance for project implementation and post-construction management.
作者
姚凯
Yao Kai(Tongchuan water authority in Shaanxi province Tongchuan727000, Shaanxi)
出处
《陕西水利》
2018年第2期104-105,共2页
Shaanxi Water Resources
关键词
龙潭水库
供水方案
取水建筑物型式选择
方案比选
Longtan reservoir, water supply scheme, water intake building type selection and selection of the schemes