期刊文献+

公路工程施工中填石路基施工技术研究 被引量:6

Study on the Construction Technology of Stone Filled Roadbed in Highway Engineering Construction
下载PDF
导出
摘要 填石路基多修筑在山区,其填筑高度较大,地基承载力不足容易导致填石路基整体沉降过大,或出现不均匀沉降。论文重点论述了目前公路工程施工中常用的填石路基施工技术,并对其质量控制要点进行重点分析,以期进一步推动公路工程的发展。 Stone filled roadbed is built in the mountain area, and the height of the filling is high. If the bearing capacity of the foundation is insufficient, it is easy to cause the overall settlement of the rockfill subgrade to be too large or uneven settlement. This paper mainly analyzes the common stone filled subgrade construction technology in highway engineering at present, and analyzes key points of quality control, to promote the development of highway engineering.
作者 李俊莲 LI Jun-lian(Huai'an County Transportation Bureau, Huai'an 076150, Chin)
出处 《工程建设与设计》 2018年第6期188-189,221,共3页 Construction & Design for Engineering
关键词 公路工程 填石路基 施工技术 控制 highway engineering filled stone roadbed construction technology control
  • 相关文献

参考文献4

二级参考文献16

共引文献39

同被引文献40

引证文献6

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部