考虑水流滞时影响的梯级水电站群短期优化调度研究 被引量:7

Short-term Optimal Operation of Cascade Hydropower Stations Considering the Delay of Flow Propagation
下载PDF
导出
摘要 针对梯级水电站群短期统一优化调度中调度期水量不平衡问题,基于水量平衡原理提出了考虑水流滞时影响的梯级水电站群短期统一优化数学模型,将受水流滞时影响的调度期分为受前一调度期影响时段、本调度期影响时段和影响下一调度期时段3部分。在此基础上,采用基于POA的模型分块求解方法,选取大渡河瀑布沟及以下梯级水电站群开展实例研究。结果表明,采用的方法能够很好地克服水流滞时所带来的计算困难,较好的体现受水流滞时影响的调度期发电效益,简单实用,有较强的通用性。 To solve the problem of unbalance in water quantity during scheduling period of short-term unified optimal operation of cascade reservoirs, a short-term unified optimization model considering the influence of flow delay time is put forward. The scheduling period affected by the flow delay time is divided into three parts: the part affected by the previous scheduling period, the part affected by this scheduling period, and the part affecting the next scheduling period. On this basis, a block resolution method based on POA is adopted. A case study of Pubugou Hydropower Station and its following cascade hydropower stations in Dadu River is carried out for its validation. The results show that the proposed method can effectively deal with the difficulty of calculating caused by the flow delay time, and can better reflect the generation benefit of the scheduling period affected by flow delay time. The method is simple and practical.
作者 肖贵友 陈仕军 李基栋 邹祖建 马光文 XIAO Guiyou1,2, CHEN Shijun1,2, LI Jidong3, ZOU Zujian4, MA Guangwen1, 2(1. College of Water Resources and Hydropower, Sichuan University, Chengdu 610065, Sichuan, China; 2. State Key Laboratory of Hydraulics and Mountain River Engineer, Sichuan University, Chengdu 610065, Sichuan, China; 3. College of Water Conservancy and Hydropower Engineering, Sichuan Agricultural University, Ya'an 625014, Sichuan, China; 3. Guodian Dadu River Hydropower Development Co., Ltd., Chengdu 610041, Sichuan, Chin)
出处 《水力发电》 北大核心 2018年第4期37-41,56,共6页 Water Power
基金 国家重点研发计划(2016YFC0402205 2016YFC0402208) 国家电网公司总部科技项目"西南电网雅砻江风光水互补优化调度策略研究"(SGSCDK00XTJS1700047)
关键词 短期优化调度 POA 滞时 分块求解 梯级电站 大渡河 short-term optimal operation POA delay time block solving cascade power station Dadu River