期刊文献+

基于成本最优的抽水蓄能电站参与系统调峰调用顺序研究 被引量:1

Study on Order of Pumped-storage Power Station in Participating System Peak Regulation Based on Optimal Comprehensive Cost
下载PDF
导出
摘要 针对抽水蓄能电站与其他电源共同参与系统调峰调用顺序进行研究,在明确连续爬坡事件和单位调节容量成本等关键概念基础上,从调峰手段调用综合成本角度,提出了包括抽水蓄能电站在内的多种手段参与系统调峰的调用优化模型。算例验证表明,利用本文方法可有效实现对系统内多种调峰手段排序,同时也表明抽水蓄能电站调用顺序与系统电源结构有关。 For studying the calling sequence of pumped-storage power stations and other conventional power sources in participating peak regulation of power system, the concepts including continuous ramping events and unit adjustment capacity cost are cleared, and then a comprehensive cost optimization model for determining the adjustment order of different peak- regulating measures is proposed. The example calculation shows that the method can effectively realize the sorting of many kinds of peak-regulating measures in power system, and the calling order of pumped-storage power stations is necessary to combine with the specific conditions of power system.
作者 张晋芳 元博 樊玉林 王晓晨 栗楠 徐志成 冯君淑 ZHANG Jinfang1, YUAN Bo1, FAN Yulin2, WANG Xiaoehen1, LI Nan1, XU Zhichen1, FENG Junshu1(1. State Grid Energy Research Institute Co., Ltd., Beijing 102209, China; 2. Technology Center of State Grid Xinyuan Co,, Ltd., Beijing 100761, Chin)
出处 《水力发电》 北大核心 2018年第4期92-95,共4页 Water Power
关键词 抽水蓄能 连续爬坡事件 调峰顺序 单位调节容量成本 pumped storage continuous ramping event peak regulating order unit adjustment capacity cost
  • 相关文献

参考文献8

二级参考文献76

共引文献351

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部