期刊文献+

大型国产抽水蓄能发电机安装调试过程设计优化综述 被引量:9

Review on the Improvements of the Main Equipment Structure Design and Manufacturing in Reversible Generator-motor of Large Domestic Pumped Storage Power Station
下载PDF
导出
摘要 抽水蓄能机组在高水头、高转速、双转向、频繁启停等运行条件下,逐渐暴露出一系列问题。近年来,国内抽水蓄能电站共计发生严重及以上缺陷及隐患近千个,以发电机和水轮机设备居多,其中发电机方面的问题比较集中,部分问题在多个电站都有出现,属于家族性问题。本文简要介绍了深圳抽水蓄能电站1号机组发电电动机在安装调试过程中遇到的问题,并对其进行了分析总结,以期对国内外同类电站提供有益借鉴。 It is found that there is a series of design and manufacturing problems in large domestic pumped storage power station with the development of high speed and large capacity,especially in generator-motor.In this paper,the detail of design and manufacturing problems were introduced,meanwhile the analysis and the structure improvement were proposed,which provide with example and reference for copper rotor bars of the same kind.
作者 陈弘昊 汪志强 陈泓宇 马永良 蒋宝钢 雷慧 李展 CHEN Honghao1, WANG Zhiqiang1, CHEN Hongyu, MA Yongliang2, JIANG Baogang, LEI Hui, LI Zhan~(l.Shenzhen Pumped Storage Power Co. Ltd., Shenzhen 518115, China ; 2.Harbin Electric Machinery Company Limited, Harbin 150040, China)
出处 《水电与抽水蓄能》 2018年第1期23-31,共9页 Hydropower and Pumped Storage
关键词 发电电动机 转子引线 磁极挂装 磁轭热加垫 上导冷却器 推力油泵 reversible generator-motor current leads rotorheated cushion oil cooler oil pump