期刊文献+

电厂秸秆资源采购模式比较研究 被引量:5

Demonstration study on straw purchasing model of zaozhuang shiliquan power plant
下载PDF
导出
摘要 在我国秸秆资源开发利用的起步过程中,秸秆资源的有效供应成为我国秸秆能源化亟待解决的重要"瓶颈"。论文在山东枣庄十里泉实地调研的基础上,针对十里泉发电厂三种可行的秸秆资源采购模式——自行采购、外包采购、产业化采购——进行定性和定量分析较,并运用层次分析法找出了适合该电厂实际情况的最佳秸秆采购方式。本文研究思路和基本方法可为我国的秸秆发电厂建立经济合理的原料采购模式提供重要参考。 Establishing effective supply of straw resource has been the bottleneck in exploitation of straw energy in P. R.Chian. The paper tries to find the most feasible purchasing mode according to comparative studing three kinds of straw resource purchasing model such as self-purchaing, contract-pruchasing and marketing purchasing. After field surveying about shiliquan power plant and Zaozhuang city, paper analyzes a few of feasible schemes comparatively which uses the quantitative analysis tool such as Mathematic, fortran, Excel, SPSS and AHP. Finally, paper summing-up that selfpurchasing model is the best one that the power plant should implement. The thought and methods of this paper have reference value in a certain extent. We can reduce the straw purchasing cost by using thought of this paper.
出处 《科学与管理》 2009年第6X期46-50,共5页 Science and Management
关键词 秸秆采购 经济效益 层次分析法 Straw Purchasing,economical benefit,AHP
  • 相关文献

参考文献6

二级参考文献7

  • 1牟宗艳.打造中国石化特色的集中采购模式[J].中国石化,2007(5):5-7. 被引量:8
  • 2朱耀明,牛根颖,徐金发.集团企业概论[M].北京:中国经济出版社,1990.
  • 3[美]埃米科·班菲尔德.战略采购管理:SEE公司每年节约1.5亿美元的故事[M].北京:中国时代经济出版社,2005.
  • 4Dornburg A, Faaij A. Efficiency and economy of wood - fired biomass energy systems in relation to scale regarding heat and power generation using comobustion and gasification technologies. Biomass Bioenergy 2001;21(2):91 - 108.
  • 5吴创之,黄海涛,郑舜鹏等.生物质气化发电的经济技术性评价[A].2000环境、可再生能源和节能国际研讨会论文集[C].北京:国家经济贸易委员会,2000.65—70.
  • 6杨柏成,吕铁彪,刘国喜.玉米秸秆气化原料供应量与供应成本分析[J].农村能源,1998(4):20-21. 被引量:6
  • 7李京京,任东明,庄幸.可再生能源资源的系统评价方法及实例[J].自然资源学报,2001,16(4):373-380. 被引量:76