摘要
采高是影响"三带"高度的最主要因素,某煤矿试采工作面采用似膏体充填开采,进而降低采高,达到降低"三带"高度的目的。通过理论推导,其等价采高为0.541 m。通过相似材料模拟得其裂隙带高度为12.9 m,通过实测确定得其裂隙带高度为13.2 m。通过以上实验得出充填开采不存在垮落带,只有裂隙带和弯曲下沉带。
The mining height is the main factor which influences the height of the "three zones", to lower the height of the "three zones" across reducing the mining height, paste-like filling mining technology is adopted in a working face of a mine. After theoretical derivation,the equivalent mining height is 0.541 m. While the height is 12.9 m,it is concluded by similar material simulation. The measured height of fractured is 13.2 m. The above experiments shows that there is only fractured zone and sagging zone ,that is to say without caving zone, in overlaying rock when filling mining technology is adopted.
作者
秦洪岩
题正义
张峰
马笑非
QIN Hong-yan1, TI Zheng-yi2, ZHANG Feng2, MA Xiao-fei2(1. Safety Engineering College, North China Institute of Science and Technology, Beijing 101601, China; 2. Liaoning Technical University, Fuxin 123000, Chin)
出处
《煤炭技术》
CAS
2018年第4期9-10,共2页
Coal Technology
基金
国家自然科学基金(51074086)
关键词
裂隙带高度
似膏体充填
等价采高
fracture zone height
paste-like filling
equivalent mining height