期刊文献+

核电厂REA系统调试问题分析及解决方案研究

Problem Analysis and Solution Research on REA System in Nuclear Power Plant
下载PDF
导出
摘要 本文介绍了核电厂反应堆硼和水补给系统(REA)的基本功能,在全范围仿真平台调试过程中出现的问题及解决办法,该解决办法在福清、方家山和海南昌江核电项目中得到应用和验证,对于后续机组REA系统设计有一定的参考价值,对避免同类问题再次发生具有重要意义。 This paper introduces the basic function of Reactor Boron and Water Make Up System, raises the problem of REA system during the pre-factory test in Distributed Control System Full Scope Simulator, and puts forward the solution for this problem. Specifically, this method has been applied and verified in Fu Oing, Fang Jiashan and Hainan Changjiang DCS project. Results show it can provide as a reference for designing REA systems and avoid the similar problems being happened again.
出处 《自动化博览》 2018年第3期76-79,共4页 Automation Panorama1
关键词 核电厂 REA系统 全范围仿真平台 Nuclear power plant REA system DCSFSS
  • 相关文献

参考文献3

二级参考文献19

  • 1郑俊,侯文生.虚拟现实技术在医学中的应用[J].大自然探索,1997(3):57-61. 被引量:7
  • 2刘学慧,吴恩华.虚拟现实的图形生成技术[J].中国图象图形学报(A辑),1997,2(4):205-212. 被引量:47
  • 3Liang K S Thomas,Yang Chung-yu,Liang Che-dai et al.Modeling of a Power Conversion System with Relap-3D/K and Associated Application to the Feedwater Blowdown Licensing Containment Design[J].Nuclear Technology,2006,(153):184 ~ 196.
  • 4The RELAP5 Code Development Team.RELAP5/Mod3 Code Manual[R].UREG/CR-5535-V2.Idaho National Engineering Laboratory,1995.
  • 5Davis C B,Weaver W L.Improvements to the RELAP5 Turbine Model[R].2003 IRUG Meeting INEEL,2003.
  • 6福建福清核电厂3、4号机组全范围模拟机设备技术规格书[S].
  • 7Richard H. Hilh Simulation,emulation,&translati on[J].Simulation, 1968(10):81-84.
  • 8王晓星,庄进,吴毅.核电厂全范围模拟机调试和测试进度安排优化浅谈[C]//2011核能行业仿真技术及应用研讨会.2011.
  • 9马小虎,潘志庚,石教英.虚拟现实系统的体系结构和软件开发工具[J].计算机工程与应用,1997,33(8):36-40. 被引量:13
  • 10钟力,胡晓峰,姚兰.虚拟环境的实时显示[J].小型微型计算机系统,1998,19(1):47-51. 被引量:5

共引文献143

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部