期刊文献+

建筑工程定额造成与清单计价应用方法

Architectural Engineering Quota Caused and List Valuation Application Method
下载PDF
导出
摘要 在91年之前,我国是按照着前苏联建筑工程的计价模式,工程建筑的项目实行按照"量价合一,固定取费"的计价模式,那么这种模式是遵循预计的定额规定的分部分项工程。自从《计价规范》的颁布与实施以来,我国的建筑工程定额造价和清单计价应用得到了很好的控制和规范,经过了几年的实践表明,计价规范是因为经济体制在改革中不断的进行深入,从质变转化成量变,同时也是程定额造价的一项重要的革命,从某种角度上来讲还是计量方法的一次革新。 Before 1991,our country uses valuation model of the former Soviet Union construction,engineering construction projects in accordance with the ' price of integration,valuation mode fixed fee ',so this model is a subpart of the project which is expected to follow a fixed.Since the promulgation and implementation of ' code of valuation ',our country architectural engineering quota cost valuation application has been very good control and specification,after several years of practice shows that,the code of valuation is because the economic system reform deeply,from the qualitative into quantitative change,at the same time also is an important revolution of quota cost,an innovation from a certain Angle terms.
作者 郑新杰
出处 《城市建筑》 2012年第09S期189-189,共1页 Urbanism and Architecture
关键词 建筑工程 定额造价 清单计价 应用方法 construction,fixed cost,inventory valuation method,application
  • 相关文献

参考文献2

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部