某大桥大体积承台混凝土温控技术应用研究 被引量:3

Research on Application of Temperature Control Technology of Mass Concrete of the Bridge Pile Caps
下载PDF
导出
摘要 依托于某大桥项目主墩承台混凝土工程,针对大体积混凝土温度控制的难题,结合工程需求及温控标准,从配合比优化、冷却水管布设、混凝土浇筑与养护等方面提出承台大体积混凝土温度控制措施,并对承台大体积混凝土进行现场温度监控。 Based on the concrete engineering project of main piers of a bridge, in order to solve the problem of temperature control of mass concrete, combined with the engineering requirements and control standard, temperature control measures of mass concrete were put forward in several ways including the mixture ratio optimization, cooling water pipe layout, concrete pouring and curing. At the same time, on-site temperature monitoring of mass concrete has been carried out.
作者 陈立兵 郭军辉 罗思桥 胡义新 陈成 师华 邓治国 Chen Libing1, Luo Siqiao1, Hu Yixin1, Chen Cheng1, Shi Hua1, Deng Zhiguo2(1. The Second Harbor Engineering Company, Wuhan 430040; 2. Shanxi Road and Bridge Construct Co. Ltd, Taiyuan 03000)
出处 《粉煤灰综合利用》 CAS 2018年第1期57-60,共4页 Fly Ash Comprehensive Utilization
关键词 承台 大体积混凝土 温控措施 pile caps mass concrete temperature control technology
  • 相关文献

同被引文献14

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部