4Cheung S O, YIU T W. Are construction disputes inevitable?[J] Engineering Management , IEEE Transactions on, 2006, 53 ( 3 ): 456-70.
5Cheung S O, PANG K H Y. Anatomy of construction disputes[J]. Journal of Construction Engineering and Management, 2012, 139 ( 1 ): 15-23.
6Saussier S . Transaction costs and contractual incompleteness: the case of Electricit6 de France [J]. Joumal of Economic Behavior & Organization, 2000, 42 (2): 189-206.
7Luo Y. Contract, cooperation, and performance in international joint ventures[J]. Strategic management joumal, 2002, 23 (10): 903-919.
8Mayer K J, Argyres N S. Learning to contract: Evidence from the personal computer industry[J]. Organization Science, 2004, 15 (4): 394-410.
9Lumineau F, Malhotra D. Shadow of the contract: How contract structure shapes interfirm dispute resolution [J]. Strategic Management Journal, 2011,32( 5 ): 532-555.
10Sertyesilisik B. Investigation on Particular Contractual Issues in Construction[J]. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2010, 2 (4): 218-227.