为满足大坝下闸蓄水的工期目标,势必会在高温、寒冷季节进行混凝土连续浇筑。通过合理温控措施选择和管理体系建设,可确保混凝土浇筑各阶段各环节具有良好温控条件,保证混凝土具有较高质量,推动工程高效优质施工建设。
In order to meet the target of water storage under the dam, the concrete will be poured continuously in the high temperature and cold season. Through the reasonable temperature control measures selection and management system construction, it can ensure that each stage of concrete pouring has good temperature control conditions, ensure the high quality of concrete, and promote the construction of high efficiency and high quality.