摘要
运用物理模型试验,对实施北运河榆林庄闸至杨洼闸段综合治理工程前后河道的行洪变化进行研究分析。给出各工况下河道的沿程水面线,分析流势流速变化规律,确定河道险工段。分析河道整治方案相关工程措施的效果,明确延芳淀湿地工程对河道行洪的影响。
Based on the fixed bed river model test, the change of flood discharge before and after the implementation of the comprehensive treatment project of Beiyun river channel from Yulinzhuang sluice to Yangwa sluice is studied and analyzed. The water surface curve of each test scene is given; the change rule of the flow velocity is analyzed; and the sections easily scoured of the main channel are determined. The paper not only analyzed the effect of engineering measures related to river regulation programs but also clarified the impact of Yanfangdian wetland project on flood discharge.
作者
王远航
王理许
杨淑慧
张春义
卢亚静
周星
WANG Yuanhang;WANG Lixu;YANG Shuhui;ZHANG Chunyi;LU Yajing;ZHOU Xing(Beijing Water Science and Technology Institute, Beijing, 100048, China)
出处
《北京水务》
2018年第2期1-5,共5页
Beijing Water
关键词
定床模型
河道治理
湿地
模型比尺
fixed bed model
river regulation
wetland
model scale