期刊文献+

中国尊大厦多腔体异形巨型柱关键施工技术

KEY CONSTRUCTION TECHNIQUE OF MUTI-CAVITY AND MEGSPECIAL-SHAPED COLUMNS IN CITIC TOWER
下载PDF
导出
摘要 中国尊大厦是世界上第一座建造在抗震设防烈度8度区,且高度超过500 m的超高层大楼,结构高度为528 m,总建筑面积43.7万m^2。结构体系[1]为框架–筒体结构,多腔体异形巨型柱位于塔楼四角,其巨型柱体量大,材质占比高,但巨型柱分段分节、高空原位拼装及厚板焊接施工难度极大。故阐述多腔体异形巨型柱的施工方法,指出此类异性多腔体钢柱的施工需考虑多方面因素,以为同类超高层施工提供借鉴意义。 CITIC Tower is the world's first super high-rise building built in seismic intensity 8 degrees zone with a height exceeding 500m, its structural height and gross floor area are 528m and 437000m2, respectively. The structural system is a frame-tube structure system. Multi-cavity special- shaped giant columns are located at the four corners of the tower, and it the huge volume of giant columns and large proportion of high grade materials. Giant-column segmentation, on-situ assembly at high-altitude and thick-plate welding are extremely difficult. The paper elaborated the construction of the multi-eavity special-shaped giant column method, points out that the construction of such multi-cavity steel column should consider many factors, which is of great significance to the construction of similar super high-rise buildings construction.
作者 赵学鑫 许立山 张俊杰 朱炜 郭泰源 ZHAO Xue-xin;XU Li-shan;ZHANG Jun-jie;ZHU Wei;GUO Tai-yuan(China Construction Steel Structure Corp. Ltd., 100026, Beijing, China;China Construction Third Engineering Bureau Co., Ltd., 430000, Wuhan, China)
出处 《建筑技术》 2018年第4期359-362,共4页 Architecture Technology
基金 国家重点研发计划项目(2016YFC0701600)
关键词 中国尊大厦 多腔体异形巨型柱 原位拼装 CITIC Tower multi-cavity special-shaped giant columns in-situ assembly
  • 相关文献

参考文献2

二级参考文献8

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部