期刊文献+

适应辅助服务市场化的自动发电控制调频容量实时计算方法 被引量:16

Real-time Calculation Method for Frequency Modulation Capacity of Automatic Generation Control Adapting to Auxiliary Service Marketization
下载PDF
导出
摘要 针对辅助服务市场化后自动发电控制(AGC)调频容量计算必须满足实时精细化的要求,从省级电网发用电平衡出发,通过分析影响调频容量需求的各种因素,提出了综合考虑负荷、新能源功率波动、联络线交换计划、机组发电计划及相关性能评价标准的AGC调频容量实时计算方法,并以华北某电网为例进行了算例分析,计算出该电网所需的AGC调频容量与电网实际运行情况相吻合,结果验证了该方法的有效性。 In order to meet the requirement of accuracy and instantaneity in frequency modulation capacity calculation for automatic generation control(AGC)after the marketization of ancillary services,the real-time calculation method of AGC frequency regulation capacity is proposed by analyzing the various factors which affect the demand of frequency modulation capacity.The load,new energy power fluctuation,tie line exchange plan,unit power generation schedule and related performance evaluation criteria are comprehensively considered in the real-time calculation method.A power grid in North China is given as an example.The calculation result indicates that the AGC frequency modulation capacity of the power grid is consistent with the actual operation condition of the power grid and the effectiveness of proposed method is verified by the result.
作者 仇进 吴继平 滕贤亮 徐瑞 于昌海 QIU Jin;WU Jiping;TENG Xianliang;XU Rui;YU Changhai(College of Energy and Electrical Engineering, Hohai University, Nanjing 210098, China;NARI Group Corporation (State Grid Electric Power Research Institute), Nanjing 211106, China;State Key Laboratory of Smart Grid Protection and Control, Nanjing 211106, China)
出处 《电力系统自动化》 EI CSCD 北大核心 2018年第8期16-21,共6页 Automation of Electric Power Systems
基金 国家电网公司科技项目"市场环境下电网调频辅助服务技术研究"~~
关键词 自动发电控制 调频容量 功率波动 联络线交换计划 机组发电计划 性能评价标准 automatic generation control frequency modulation capacity power fluctuation tie line exchange plan unit powergeneration schedule performance evaluation criteria
  • 相关文献

参考文献7

二级参考文献76

共引文献188

同被引文献160

引证文献16

二级引证文献130

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部