兰州红楼时代广场超厚筏板基础施工技术 被引量:2

Construction Technology of Extra-thick Raft Foundation in Lanzhou Red Mansion Times Square
下载PDF
导出
摘要 兰州红楼时代广场主楼筏板基础最厚达到8.9m,而且钢筋配置密集、层数多、自重大,通过对超厚大体积混凝土、钢筋支撑架、超低位混凝土泵管布置等采取一系列措施,确保了钢筋支撑架的安全和混凝土的正常泵送,有效控制了混凝土温差,确保了筏板工程质量。 The raft foundation maximum thickness of Lanzhou Red Mansion Times Square main building reaches 8. 9 m,and the reinforcement is intensive,multi layers and heavy self-weight,since a series of scientific measures adopted on super thick mass concrete,reinforced support frame,super low concrete pump pipe layout,etc. which ensure the safety of pump steel supporting frame and the normal of concrete delivery,the concrete temperature was controlled effectively,the raft quality of the project was ensured.
作者 金振 周剑刚 潘国华 JIN Zhen;ZHOU Jian'gang;PAN Guohua(Guangsha Construction Co. , Ltd. , Hangzhou , Zhejiang 310012 , China)
出处 《施工技术》 CAS 2018年第7期39-42,共4页 Construction Technology
关键词 高层建筑 混凝土 筏板基础 配合比 施工技术 tall buildings concrete raft foundation mix proportion construction
  • 相关文献

参考文献6

二级参考文献26

共引文献37

同被引文献6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部