摘要
南八滩闸是滨海沿海5座挡潮闸之一,分析了滨海县南八滩闸下游引河河道的淤积成因,以及清淤疏浚施工过程及实施效果,并提出了防淤治淤措施。
The south eight beach sluice is one of the 5 coastal tide lock in Binhai County. The causes of sediment in the downstream rivers of south eight beach sluice, the dredging construction process and implementation effect were analyzed, and the prevention and dredging governance were put forward.
作者
于雷
周善华
YU Lei;ZHOU Shanhua(North Eight Beach Canal Lock Management Office of Binhai County,Yancheng 224500,Jiangsu;Binhai County Water Conservancy Construction Company,Yancheng 224500,Jiangsu)
出处
《江苏水利》
2018年第1期70-72,共3页
Jiangsu Water Resources
关键词
南八滩闸
淤积
清淤治理
south eight beach sluice
sedimentation
dredging governance