期刊文献+

市政工程顶管施工技术探讨 被引量:2

The pipe jacking construction technology in municipal engineering
下载PDF
导出
摘要 从顶管施工技术原理和三种平衡理论出发,详细介绍了顶管施工技术实施过程,包括前期准备、设备的安装与调试、顶管井的施工和施工步骤的技术特点及技术流程,指出该技术对于保证市政工程项目的顺利实施具有显著意义。 The principle and three kinds of balance theory of pipe jacking construction technology are set out in this paper. The technical feature and process of implementation process of pipe jacking construction technology are proposed, such as initial preparation, equipment installation and debugging, top tube well construction and construction steps. The pipe jacking construction technology has a significant meaning to ensure the smooth implementation of the municipal engineering project.
作者 杜红燕 Du Hongyan(Taiyuan Municipal Public Works Quality Supervision Station , Taiyuan 030012, China)
出处 《山西建筑》 2018年第9期56-57,共2页 Shanxi Architecture
关键词 顶管 施工技术 市政工程 pipe jacking, construction technology, municipal engineering
  • 相关文献

参考文献6

二级参考文献10

共引文献28

同被引文献10

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部