摘要
结合渝贵铁路某顺层含软弱夹层路堑高边坡工点变更设计,通过变更原因和变更处理措施分析,总结在此类工程中应注意的问题,为以后的类似工点设计和施工提供参考。
Combined with the altered design of the high bedding slope with intercalated layer in Chongqing-Guiyang railway, through the analysis of the reasons for change and change measures, summary in this type of project should pay attention to the problems, provide a reference for the similar project design and construction.
作者
李文娟
Li Wenjuan(Institute of Quality Supervising of Communication Construction Engineering in Guizhou Province, Guiyang 550081, China)
出处
《山西建筑》
2018年第9期126-127,共2页
Shanxi Architecture
关键词
路堑高边坡
变更设计
软弱夹层
cutting high slope, altered design, weak intercalated layer