期刊文献+

空心板和T梁预制场的建设方案设计 被引量:1

On the comprehensive construction scheme of hollow slab and T beam prefabricated field
下载PDF
导出
摘要 桥梁工程施工过程中,梁板预制是直接关系到桥梁工程施工进度和质量问题的核心工序。因此重点对比分析上部结构空心板及T梁预制场地建设方案,总结能够最大程度降低施工成本,进一步提高施工进度的优化方案,并提出了梁板预制质量控制要点,以期能为同行提供技术借鉴。 In the course of bridge construction, beam slab prefabrication is the core process which is directly related to the construction progress and quality of bridge engineering. Therefore, this paper focuses on the comparative analysis of the upper structure of hollow plate and T beam prefabricated construction scheme, up to the greatest extent to reduce the construction cost, to further improve the optimization of construction schedule, and puts forward the key points of quality control of precast beam plate, in order to provide technical reference counterparts.
作者 李梅 Li Mei(Shanxi Jimhong Road and Bridge Co. , Ltd , Jinzhong 030600, Chin)
出处 《山西建筑》 2018年第9期184-185,共2页 Shanxi Architecture
关键词 预制场 空心板 T梁 施工进度 prefabricated field, hollow slab, T beam, construction progress
  • 相关文献

参考文献5

二级参考文献6

共引文献7

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部