摘要
因施工安全及工后环保和山体力学平衡安全的需要,结合工程实际,提出了一种在隧道开挖时不用进行大面积边仰坡削坡来进洞的施工技术,该施工技术能保证安全、快速、环保的进洞。
In order to meet the standards of the construction safety, environmental protection and dynamic balance of mountains, the paper points out the construction technique in the tunnel excavation without adopting the large heading slope tunneling by combining with the engineering facts, so as to ensure the safe, speedy and environment-friendly tunneling.
作者
张秀琴
Zhang Xiuqin(Shanxi Jinzhong Road and Bridge Construction Group Co., Ltd , Jinzhong 030600 , Chin)
出处
《山西建筑》
2018年第9期194-195,共2页
Shanxi Architecture
关键词
隧道
洞口
边仰坡
施工技术
tu n n e l , cave entrance, heading slope, construction technique